
Add to Cart
The escalator synchronous belt drive is composed of an endless belt with equidistant teeth on the inner peripheral surface and a pulley with corresponding teeth. During operation, the belt teeth mesh with the tooth slot of the pulley to transmit motion and power. A new type of belt drive with respective advantages of belt drive and chain drive gear drive.
.
Details for OTIS Escalator Spare Parts Timing Belt GT 14M-1960-18
Brand | OT |
Part No. | 14M-1960-18 |
MOQ | 1PC |
Transportion | TNT, UPS, DHL, Fedex, Air, Sea |
Applicable | Escalator |
Packages | Carton, Wooden case, Pallet etc |
Delivery Time | Normally 2-3 working days after payment |
Payment Method | Company Bank, Western union, alibaba, Paypal etc |
Pictures for OTIS Escalator Spare Parts Timing Belt GT 14M-1960-18
Precautions for installation and use of synchronous belts and synchronous pulleys:
Reduce the center distance of the pulley. If there is a tensioner, loosen it first, and then adjust the center distance after installing the belt. For the transmission with fixed center distance, the pulley should be removed first, the belt should be installed on the pulley, and then the pulley should be fixed on the shaft.